2011 - London Southend Airport, UK: New Terminal Sizing & Concept Design for Read Construction Design & Construction Bid

 

Southend2

 

  • Review tender documents, drawings & specifications
  • Advise on the terminal operations, processing & security requirements
  • Carry out floor space and processor calculations & prepare floor areas spread sheet
  • Prepare operational functional analysis diagrams & concept designs for the planning of the terminal 
  • Advise on the apron requirements & prepare concept plans
  • Advise on the IATA, ASIAD & CAA regulations & requirements
  • Co-ordinate specialists and sub consultants input