2015/16 – Nice International Airport France: Technical Advisor to SDG/Ferrovial for Concession Bid

Re-development of Terminals 1 & 2 to meet demand from 11mppa to 22mppa for 26-year concession including terminal planning and landside re-planning. The project included existing asset assessment, capacity calculations of existing assets, sizing calculations for all facilities to 2043, concept designs for new terminals/piers/satellites, airport master plan to 2043, capex forecast for all developments to 2043, maintenance capex forecast for existing facilities and new developments to 2043, Red flag and final reports.

Typical tasks
|
Validate Realistic Capacities of Terminals |
Review plans of terminals to determine the capacity of prime processors |
|
T1 Functional Layouts |
Prepare functional layouts of existing plans. Plan phased expansions and integrate with existing layout |
|
Commercial Layouts |
Review layout drawings when available, determine the proportion of space provided for flight assembly at the gates and suggest alterations if appropriate |
|
T1 Basement Level |
Review basement plan to identify area designated for baggage handling. Assess capacity of HBS and consider how future expansion can meet demand |
|
Pax Split Between T1 & T2 and Proportional Split of Schengen & Non Schengen in Each Terminal |
Ascertain proportional split of traffic in each terminal so that the phased expansion and gate/stand designation can be determined and agreed |
|
Tramway Location & Integration |
Obtain information of the plans for the new tramway, serving both terminals. How does the tramway interface with the existing landside infrastructure |
|
Car Parking |
Determine extent of any parking required in addition to the expansion of P3 |
|
Maintenance and Renewals |
Refine current assumptions, which are high-level |
|
GA |
Refine assessment of capex requirements especially if traffic decant strategy |