2003 - Doncaster Robin Hood Airport: New low cost airport & terminal for 2.3 mppa & future expansion: Project Director & Lead Designer

 

 

  • Brief development, analysis of data
  • Sizing/processor calculations for planned development to 2.5mppa
  • Site survey and inspections
  • Terminal concept design
  • Management of development for terminal and airport master planning
  • Production of final design reports
  • Client presentations
  • Preparation of terminal functional planning drawings and phasing plans
  • Preparation of 3D images
  • Preparation of development master plans for phased growth to 10mppa
  • Production of final submission report

 