2015 - Chengdu Airport International Design Competition: Principle Architect with Arup Design Team

 

 

Arup was shortlisted with 6 other international design teams for the design competition.

Richard Chapman of ADC was asked to be the Principle Architect for the Arup team.

 

chengdu2b

 

  • Concept design for 2 new terminals to provide capacity for 40mppa. Terminal 1 to be for international and domestic traffic and Terminal 2 for domestic traffic.
  • Total floor area to be approximately 520,000m2
  • 103 contact stands, 16 remote stands, 18 cargo stands, 26 repair and maintenance stands and 18 general aviation stands, making a total of 181 in all
  • The terminal master planning to be part of an overall master plan to provide a total of 4 separate terminals and 258 stands when complete.
  • The scheme is to provide a multimodal transport interchange for long distance train, local metro and vehicular road traffic.
  • Car parking, and hotels are to be provided in the landside forecourt area

 

chengdu2a

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.